Share:
CN
中国地质调查局
  • About CGS
    • Missions
    • Organizations
    • Affiliated Organizations
    • Contact Us
    • Feedback
  • Objectives
  • Achievements
  • Geocloud
  • Laws & Policies
    • Laws
    • Policies
  • Related Links
    • Global Institutions
    • Domestic Institutions

Achievements

  • Achievements
Geological Info & Data OneGeologyChina Periodicals
HOME > Achievements > Golmud-Lhasa Railway Geological Survey

Golmud-Lhasa Railway Geological Survey

  • REFERENCES
  • QUANTITATIVE ASSESSMENT ON CRUSTAL STABILITY ALONG THE GOLMUD-LHASA RAILWAYACROSS THE TIBETAN PLATEA
  • NUMERICAL MODELINGAND STABILITYASSESSMENT OF TUNNELS
  • IN-SITU STRESS OF TUNNELS AND STRESS CHANGE FROM THE Ms 8.1 KUNLUN EARTHQUAKE
  • DESTRUCTION OF ENGINEERING FACILITIES CAUSED BY MIGRATING PINGOS
  • GEOLOGICAL HAZARDS POSED BY ACTIVE FAULTS AND PERMAFROST TO ENGINEERED FACILITIES
  • SLIP-RATE AND HOLOCENE SEISMIC FRACTURES OF THE DAMXUNG-YANGBAJAIN ACTIVE FAULT
  • WEST BOUNDARY FAULT OF GULU-SANGXIONG GRABEN AND FRACTURES FROM THE Ms 7.5 JIUZILA EARTHQUAKE
  • SLIP-RATE OF THE NORTH BOUNDARY FAULT OF THE ANDO BASIN
  • SLIP-RATE OF THE WEST BOUNDARY FAULT OF THE WENQUAN GRABEN
  • SLIP-RATE OF THE BENGCO DEXTRAL-SLIP FAULTAND FRACTURES FROM THE Ms 8.0 BENGCO EARTHQUAKE
  • SLIP-RATE OF THE HOHXIL STRIKE-SLIPACTIVE FAULT
  • MOVEMENT OF ACTIVE FAULTS AND SEISMIC EVENTS IN EAST KUNLUN MTS.
  • IDENTIFICATION OF ACTIVE FAULTS ALONGTHE GOLMUD-LHASA RAILWAY
  • QUATERNARY GEOLOGY AND TIME SCALE ESTABLISHED ALONG THE GOLMUD-LHASA RAILWAY
  • GEOGRAPHY, ENVIRONMENT AND WORKING CONDITIONS ALONG THE GOLMUD-LHASA RAILWAY
  • PROGRESS AND DISCOVERIES
  • INTRODUCTION TO THE PROJECT
  • SUMMARY
Home|About CGS| |SiteMap
Copyright © 2013 CGS. All Rights Reserved
Bureau of Information Industry ICP